What drives the total cost
- Number of bays and expected vehicles per day
- Lift capacity and type
- Pump size and power (single-phase or three-phase)
- Compressor size and tank
- Foam / shampoo equipment
- Civil work: foundation, drains, water storage and shed
- Electrical supply, cabling and earthing
- Piping and installation labour
- Delivery to your city
Equipment price vs project cost
Equipment price is only one part. Civil work, water, drainage and electrical work can be a large share of a new station, and they depend entirely on your site. Compare quotations on the same scope: what is included, what is excluded, and what warranty and spares are offered.
About the prices on our homepage
Prices shown on the homepage are indicative. The written quotation confirms the specification, freight and installation for your site and is the price that applies.
How to get an accurate estimate
Send your city, the equipment you want, power availability and bay plan. Use the quotation form or message us on WhatsApp.